UPS System Industrial UPS
Price: 1432874
MRP 2827988 You save 1395114
| Output Capacity | 120 KVA |
|---|---|
| Output Phase | 3 Phase |
| Input Phase | 3 Phase |
| Full Load Backup | 15-20 Minutes |
| Back up at 50% Load | 30-40 Minutes |
| Battery DC Bus | 372- Vdc |
| Flexible Battery Option | Yes |
| Battery Capacity (VAH) | 89280 Vah |
| Maximum Charger Capacity | Amp. |
| Warranty for UPS | 24 Month(S) |
| Warranty for Battery | 24 Month(S) |
| Isolation Transformer | In-Built |
| Paralleling Options | In-Built |
| Battery Interlink Connectors | Yes |
| Cabling 5 Meters For Input and Output | Yes |
| Battery Rack | Yes |
| Paralleling kit for synchronising | In-Built |
| Item Image | Item Name | Model No. | HSN Code | Qty | UOM | Rate | Amount | GST(%) | GST | Total Amount |
|---|---|---|---|---|---|---|---|---|---|---|
| BPE Make 120 KVA 3:3 Phase Industrial On-Line UPS |
GTC33120L62 |
85049090 |
1 |
No. |
577500
|
577500
|
18
|
103950
|
681450
|
|
| Interlink Connector for 120 KVA UPS - 372 V DC |
IC-120K-372V |
85366990 |
2 |
No. |
Ask Price
|
0
|
18
|
0
|
Ask Price
|
|
| Grand Total | 67 |
1214300 |
218574 |
1432874 |
||||||
| Item Image | Item Name | Model No. | HSN Code | Qty | UOM | Rate | Amount | GST(%) | GST | Total Amount |
|---|---|---|---|---|---|---|---|---|---|---|
| BPE Make SNMP Card for 3 Phase On Line UPS |
BPESNMP03 |
85049090 |
|
No. |
Ask Price
|
Ask Price
|
18
|
Ask Price
|
Ask Price
|
|
| BPE Make Paralleling Kit for 3 Phase UPS |
BPEPK03 |
85049090 |
|
No. |
Ask Price
|
Ask Price
|
18
|
Ask Price
|
Ask Price
|
| Item Image | Item Name | Price |
|---|---|---|